Distillery Project – Unfired Pressure Vessel
2205 Stainless Steel 16m Ethanol Still – AS 1210 |
 |
 |
2205 Stainless Steel Reboiler attached to 16m Ethanol Still
|
Non Arsenical Phosphorous de oxidized Copper with 304L Stainless Steel top and bottom – AS 1210
|
General Fabrication
Mild Steel Multi Lift Bin from Sugar Cane transport – AS 1554.1
|
Mild Steel Box Section Sphere for Bert Hinkler Museum – AS 1554.1
|
Ceramic Tile lined mild steel launder for coal mine – AS 1554.1
|
3cr12 Stainless Steel ID Fan Casing for Sugar Mill Boiler Stack – AS1554.6
|
Techniplan – Mild Steel Knife gates and guards for 1000 tonne coal bin – AS 1554.1
|
Coal Mine - Walkways and handrails – AS 1554.1
|
Gladstone Port - Alloy railing for bridge – AS 1665
|
TMR - Bridge Traffic Rail posts – AS 1554.1
|
Orica –Stainless Steel Chemical Bunds – AS 1554.6
|
Sunwater – Mild Steel Handrails and platforms – AS 1554.1 For Qld Intersafe programme – approx. 1km platforms and 4 kms handrails
|
Projects over time
|
Bundaberg Distillery – Chill Filtered Tank Farm
- Fabricate and install 300 metres of
walkways and spiral staircases 5 m above
ground level.
- Fabricate and install 10 stainless
vessels with knuckle rolled cones, each 6,000
litre capacity.
- Fabricate and install 720 m of stainless
ethanol tubing, pumps and valves to complete
chill filtered tank farm and storage bond.
- Fabricate and install site run ethanol
piping to connect new bond with existing
plant.
AS 1554.1 / AS 1554.6 / AS 4041
|
|
|
Bundaberg Distillery – New Copper Ethanol Still
Non Arsenical Copper - Ethanol stills, condensers, rum pot columns and rum pot coils and copper ethanol piping Ethanol Still. Fabricated and install to AS1210 / AS 4041
|
|
|
|
Bundaberg Rum Distillery – Bond 14 Storage Bond
- Fabricate ad install 400 metres of walkways and spiral staircases 5 metres above ground level
- Fabricate and install all stainless steel ethanol tubing, pumps and valves to pipe up 80 off 80,000 litre capacity timber ethanol storage vats
- Fabricate and install 300 metres of steel pipe bridges and site run 900 metres of ethanol, effluent and air piping along bridgework back to plant
AS1554.1 / AS 1554.6 / AS 4041
|
|
Bundaberg Distillery – Bond 15 Storage Bond
- Fabricate and install stainless steel
ethanol tubing, pumps and valves to service 90
off 80,000 litre capacity ethanol storage vats
- Fabricate and install air and effluent
piping for internals of bond
- Fabricate and install walkways and spiral
staircases for vat access
- Fabricate and install steel pipe bridges
between Bond 14 and Bond 15 and fabricate and
install site run tubing between Bonds. Ethanol
lines were in one piece without flanges, 5m off
the ground
AS 1554.1 / AS 4041
|
|
|
|
Bundaberg Distillery – 4 New Cooling Towers
- Install 4 new cooling towers, fabricate
and install support steelwork and steel
pipe bridges
- Fabricate and install all stainless steel
piping required for towers. 600m of
piping up to 400NB
- Carry out plant modifications and new
piping installations to complete cooling
tower installation
AS 1554.1 / AS 1554.6 / AS 4041
|
Bundaberg Distillery - Spiral Staircase - galvanised with
mirror finish stainless top rail. Fabricated & Installed - AS1554.1
|
Millaquin Sugar Mill – Stainless Steel tube work for Mud Filter upgrade & refurbish. Fabricated & Installed - AS1554.6
|
|
|
| Sunwater – Crane gantry for Claude Wharton Dam. Fabricated & Installed – AS 1554.1
|
Access Stairs & Walkways. Fabricated & Installed – AS 1554.1
|
CMI Industries - 3.8m dia Aluminium Mould for Polyethylene rotational moulding
|
Stainless Steel Holding Tank & AS 4041 Piping System – Food Grade – Fabricated & Installed – AS 1554.6 / AS 4041
|
Mild Steel, Stainless Steel and Bisalloy Telescopic and Clam Action Chute for Bengalla Coal – AS 1554.1 / AS 1554.6
|
2205 Stainless Vessel (Fermenter) 12.6m long x 3.8m dia
with knuckle rolled Cone. Fabricated and Installed – AS 1554.6
|
Bundaberg Distillery - Stainless Steel Instrument and
Test Module AS 1554.6 / AS 4041
|
Bundaberg Sugar – Mild Steel Crystalliser Coils – AS 1554.1 / AS 4041
|
Bundaberg Sugar – 304L Stainless Steel Tank – AS 1544.6
|
Aluminium 16.5m Charter Boat built to 2C Survey to AS 1665
|
Bundaberg Brewed Drinks - 316 Stainless Steel Food Grade
Manifold – AS 1554.6
|
Blackwater Mine Site – Aluminium Collapsible Crib Hut Stairs – AS 1665
|
Norwich Park Mine – Mild Steel Dust Suppression
Spray Boom – AS 1554.1
|
Stair Set pre-assembled and Hand Rails fabricated in Workshop
|
South Walker Creek Mine – Chain Feeder – As 1554.1
|
|
|
McBryde Corporation – Norwich Park Coal Mine - NP2 Gantry and Conveyor System - Our responsibility for this project was Stairs, Handrails, Walkways, Conveyor Frames and Top Platform – AS 1554.1